DOE extends comment period on VTR environmental review

February 16, 2021, 6:58AMNuclear News

The Department of Energy has extended the public review and comment period for the Draft Versatile Test Reactor Environmental Impact Statement (DOE/EIS-0542) through March 2, 2021.

The DOE issued the draft EIS for the Versatile Test Reactor (VTR) for comment on December 21, 2020. The draft document identifies Idaho National Laboratory as the DOE’s preferred location for the VTR, a proposed sodium-cooled fast-neutron-spectrum test reactor that, according to the DOE, will enhance and accelerate research, development, and demonstration of innovative nuclear energy technologies.

In August 2020, Battelle Energy Alliance, which operates INL for the DOE, began contract negotiations with a Bechtel National–led team that includes TerraPower and GE Hitachi Nuclear Energy to support the design and construction of the VTR.

To continue reading, log in or create a free account!

Related Articles

ANS Annual Conference: Nuclear waste

June 27, 2024, 3:03PMNuclear News

With increasing demand for clean, reliable, and safe sources of energy, the conversation around nuclear energy is changing. And so too is the conversation around nuclear waste, even as the...