New transfer lines installed on Hanford tank waste evaporator
Washington River Protection Solutions (WRPS) crews recently finished installing about 1,300 feet of new waste transfer lines between a tank waste evaporator and a nearby tank farm at the Department of Energy’s Hanford Site, near Richland, Wash. WRPS is the tank operations contractor for the DOE’s Office of Environmental Management (EM).