Belgium’s nuclear phase-out policy claims second victim

February 2, 2023, 10:34AMNuclear News
The Tihange nuclear power plant. (Photo: Engie Electrabel)

Unit 2 at Tihange, one of Belgium’s two nuclear power plants, was permanently disconnected from the grid late on the evening (local time) of January 31, operator Engie Electrabel has announced.

The 1,008-MWe pressurized water reactor is the second unit in Belgium’s nuclear reactor fleet to be retired in accordance with the country’s 20-year-old law mandating a gradual phase-out of nuclear power. The first Belgian unit to be retired, Doel-3, a 1,006-MWe PWR, was shut down on September 23, 2022. Remaining in operation are Doel-1, -2, and -4 and Tihange-1 and -3.

To continue reading, log in or create a free account!

Related Articles

IAEA convoy hit by Russian drone

December 11, 2024, 12:00PMNuclear News

A drone targeted and damaged an official vehicle of the International Atomic Energy Agency on December 10 as it traveled toward the front line in eastern Ukraine during a rotation of IAEA...