Hanford runs tests for melter replacements

March 2, 2023, 12:06PMRadwaste Solutions
Concrete blocks are loaded onto a metal base and transporter during tests on a gantry crane system that will lift replacement melters for Hanford’s WTP. (Photo: DOE)

The Department of Energy has announced that tank operations contractor Washington River Protection Solutions (WRPS) and subcontractor Atkins are making progress at the Hanford Site in Washington state in their preparations to provide replacement melters to treat radioactive and chemical tank waste for the site’s Direct-Feed Low-Activity Waste program.

To continue reading, log in or create a free account!

Related Articles

ANS Annual Conference: Nuclear waste

June 27, 2024, 3:03PMNuclear News

With increasing demand for clean, reliable, and safe sources of energy, the conversation around nuclear energy is changing. And so too is the conversation around nuclear waste, even as the...