Newswire

Tag: ontario power generation

OPG and Moltex join forces on recycled fuel project

April 1, 2021, 6:58AMNuclear News

Ontario Power Generation’s Centre for Canadian Nuclear Sustainability (CCNS) will collaborate with nuclear technology firm Moltex Energy on a project aimed at recycling used fuel from CANDU reactors, the electricity generator announced March 30.

The CCNS will provide C$1 million (about $800,000) in funding to assist Moltex in demonstrating the technical viability of its process to recycle used CANDU fuel. That process, known as WAste to Stable Salt (WATSS), has the potential to reduce storage needs for used fuel, according to Moltex.

Canada’s Darlington-1 ends record run

February 9, 2021, 12:00PMNuclear News

A view of the Darlington-1 turbine hall. Unit 1 has set a new world record for continuous operation by a nuclear power reactor. Photo: OPG

In continuous operation since January 26, 2018, Ontario Power Generation’s Darlington-1 was taken off line last Friday for an inspection and maintenance outage after a record-setting run of 1,106 days, the Canadian utility has announced.

On September 15 of last year, the unit set a new world record for a power reactor, with 963 days of continuous operation, breaking the previous mark of 962, set by a reactor at India’s Kaiga plant in December 2018, according to OPG.

Dependable Darlington: “Unit 1’s record-setting run highlights the excellent work carried out by our dedicated nuclear professionals throughout the pandemic to ensure Ontarians and frontline workers battling COVID-19 can count on a steady supply of power 24 hours a day, seven days a week,” said Sean Granville, OPG’s chief operating officer. “It also highlights the effectiveness of our preventive maintenance programs and the overall reliability of our nuclear fleet.”

GE Hitachi SMR reaches U.S. licensing milestone

December 2, 2020, 12:00PMNuclear News

A cutaway view of the BWRX-300. Image: GE Hitachi Nuclear

The Nuclear Regulatory Commission has issued a final safety evaluation report for the first of several licensing topical reports (LTR) submitted by GE Hitachi Nuclear Energy (GEH) for the BWRX-300 small modular reactor, the company announced on December 1.

The initial LTR, titled “BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection,” was submitted to the NRC in December 2019, officially beginning the U.S. licensing process. This LTR forms the basis for the “dramatic simplification” of the BWRX-300, according to GEH.

In its announcement, GEH noted that two additional LTRs were submitted in early 2020 and that it anticipates reviews of those reports to be completed in the coming months. A fourth LTR was submitted in September 2020, the company added.

OPG resumes planning for new nuclear at Darlington

November 25, 2020, 6:57AMNuclear News

Darlington nuclear power plant. Photo: OPG

Ontario Power Generation (OPG) recently announced the resumption of planning activities for future nuclear power generation at its Darlington site, with a goal of hosting a grid-size small modular reactor as soon as 2028. Originally, plans for the Darlington new nuclear project were focused on the construction of traditional large reactors.

Located in Clarington, Ontario, Darlington is the only site in Canada currently licensed for new nuclear. OPG was granted a license from the Canadian Nuclear Safety Commission (CNSC) in 2012 to allow site preparation activities for the project. The company has applied to renew the license, which is set to expire in August 2022. The CNSC will hold a public hearing on June 9–10, 2021, to consider the license renewal.

Early last month, OPG announced that it was working with three grid-scale SMR technology developers—GE Hitachi, Terrestrial Energy, and X-energy—to advance engineering and design work, with the goal of identifying options for future deployment.

Advanced reactor marketplace

October 29, 2020, 10:35AMNuclear News

Advanced reactor developers see potential markets for reactors in a range of sizes that offer clean, reliable, flexible, and cost-competitive power. Many have reached agreements with suppliers, utilities, and others to support the demonstration and possible deployment of their designs. Nuclear News is following these activities. Read on for updates and check back with Newswire often for more on the Advanced Reactor Marketplace.

Canada has invested Can$20 million in Terrestrial Energy’s 195-MW Integral Molten Salt Reactor through the Ministry of Innovation, Science and Industry, the company announced on October 15. In accepting the investment, Terrestrial Energy, which is based in Oakville, Ontario, has committed to creating and maintaining 186 jobs and creating 52 co-op positions nationally. In addition, Terrestrial Energy is spending at least $91.5 million on research and development. According to the company, the funds will assist with the completion of a key pre-licensing milestone with the Canadian Nuclear Safety Commission.

Two days earlier, Terrestrial Energy USA and Centrus Energy announced that they had signed a memorandum of understanding to evaluate the logistical, regulatory, and transportation requirements to establish a fuel supply for Integral Molten Salt Reactor power plants, which would use standard-assay low-enriched uranium at an enrichment level less than 5 percent.