Newswire

Tag: rbmk-1000

Unit 1 at Kursk plant is retired

December 22, 2021, 9:30AMNuclear News
Reactor operators in the control room at Kursk I-1, as the unit is powered down for good. (Photo: Rosenergoatom)

After 45 years of producing electricity, the first unit at Russia’s Kursk nuclear power plant has been retired, plant operator Rosenergoatom announced on Monday. Kursk I-1, one of the facility’s four 925-MWe light water–cooled graphite-moderated reactors, model RBMK-1000 (a Chernobyl-type reactor), was permanently shut down at 00:24 Moscow time on December 19.

New unit delivers first electricity to Russian grid

October 30, 2020, 7:02AMNuclear News

Rosenergoatom, the electric power division of Russia’s state-owned nuclear power corporation Rosatom, announced on October 23 that Leningrad II-2 has been connected to the grid. The unit is one of two Generation III+ VVER-1200 pressurized water reactors at the Leningrad nuclear plant.

The reactor will replace Leningrad I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor that will permanently cease operation at the end of 2020 after 45 years of service. Fuel loading at Leningrad II-2 began in July, and initial criticality was achieved in August. Following the trial operation, the unit will be shut down for an additional equipment inspection by a state commission before being put into commercial operation early next year, according to Rosenergoatom.

Leningrad II unit reaches first criticality

September 2, 2020, 9:27AMNuclear News

Rosatom officials and plant staff celebrate in the control room at Leningrad II-2 as the unit achieves first criticality. Photo: Rosatom

Rosenergoatom, the electric power division of Rosatom, Russia’s state-owned nuclear power corporation, announced on August 31 that Leningrad II-2 has achieved initial criticality. The unit is one of two Generation III+ VVER-1200 pressurized water reactors at the Leningrad nuclear plant.

Leningrad II-2 is scheduled for commercial start early next year, replacing Leningrad I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor that will permanently cease operation at the end of 2020 after 45 years of service. Fuel loading at Leningrad II-2 began in July.

Fuel loading begins at Leningrad II-2

July 21, 2020, 11:57AMNuclear News

Technicians at the Leningrad II-2 plant, where fuel loading recently took place. Photo: Rosenergoatom

The first of 163 nuclear fuel assemblies has been loaded into Leningrad II-2, marking the beginning of the Generation III+ unit’s physical startup, Rosenergoatom announced on July 19.

The electric power division of Rosatom, Russia’s state-owned atomic energy corporation, Rosenergoatom is the operator of all of Russia’s nuclear power plants. The fuel for Leningrad II-2, a 1,085-MWe VVER-1200 pressurized water reactor, was manufactured at the Novosibirsk Chemical Concentrates Plant, part of Rosatom subsidiary TVEL.