Newswire

Tag: vver-1200

Rooppur-2 reactor pressure vessel installed

October 25, 2022, 9:30AMNuclear News
At Bangladesh’s Rooppur plant, a Liebherr-11350 heavy caterpillar crane raises the reactor vessel to Unit 2’s transportation portal. (Photo: Rosatom)

In case anyone forgot, Russia can build nuclear power plants, not just occupy them—as discussed a week ago on Newswire. Last week in Bangladesh, workers completed the installation of the reactor pressure vessel (RPV) for the second unit at the Rooppur construction site.

KHNP wins turbine island construction contract for Egyptian plant

August 31, 2022, 7:05AMNuclear News
A digital rendering of Egypt’s El Dabaa plant. (Image: Nuclear Power Plants Authority)

Korea Hydro and Nuclear Power (KHNP) has signed a contract with Atomstroyexport JSC—the engineering division of Russia’s Rosatom—to build the turbine islands for Egypt’s El Dabaa nuclear power plant, construction of which commenced just last month with the pouring of first concrete.

Akkuyu-1 polar crane mounted

August 24, 2022, 9:30AMNuclear News
Turkey’s Akkuyu-1 receives its polar crane. (Photo: Akkuyu Nuclear)

Akkuyu Nuclear, the Ankara-based Rosatom subsidiary established to manage Turkey’s Akkuyu nuclear plant project, has announced the successful mounting of the Unit 1 polar crane. The operation was carried out using a Liebherr LR 13000 crane and took approximately four hours, according to Akkuyu Nuclear.

Also referred to as a circular bridge crane, the polar crane operates on a circular runway located near the spring line of the containment building. It is used for a wide range of loading and lifting tasks within containment, including reactor-head removal/replacement and fuel loading/unloading.

Construction permit issued for first Egyptian unit

July 14, 2022, 3:00PMNuclear News
A construction permit was issued for the first of four proposed reactors at Egypt’s El Dabaa site, about 185 miles northwest of Cairo. (Image: Wikipedia)

The Egyptian Nuclear and Radiological Regulation Authority (ENRRA) recently issued the construction permit for the first of four proposed Russian-designed and -supplied reactors at Egypt’s El Dabaa site, located on the Arab nation’s Mediterranean coast, about 185 miles northwest of Cairo.

An application for the permit was submitted by Egypt’s Nuclear Power Plants Authority (NPPA)—the public entity charged with operating the plant—in June of last year.

Poll: Finns favor fission at record level

May 24, 2022, 7:00AMNuclear News

The Finnish public’s support for nuclear power is at an all-time high, according to a recent opinion poll conducted by Kantar Public, a London-based consulting and research firm.

Commissioned by Finnish Energy—the trade association for Finland’s energy sector—the poll finds that 60 percent of respondents have either a “fully positive” or “mainly positive” perception of nuclear power as an energy source (34 percent and 26 percent, respectively), up from 49 percent in a 2021 Kantar poll.

Contract with Rosatom for Finnish reactor scrapped

May 5, 2022, 6:59AMNuclear News
An artist’s rendering of the Hanhikivi plant. (Image: Rosatom)

Finnish energy company Fennovoima has terminated, effective immediately, its engineering, procurement, and construction (EPC) contract with RAOS Project Oy, a subsidiary of Russia’s Rosatom, for the delivery of a 1,200-MWe VVER-1200 pressurized water reactor at the Hanhikivi site in Finland’s Pyhäjoki municipality.

Unit 1 at Kursk plant is retired

December 22, 2021, 9:30AMNuclear News
Reactor operators in the control room at Kursk I-1, as the unit is powered down for good. (Photo: Rosenergoatom)

After 45 years of producing electricity, the first unit at Russia’s Kursk nuclear power plant has been retired, plant operator Rosenergoatom announced on Monday. Kursk I-1, one of the facility’s four 925-MWe light water–cooled graphite-moderated reactors, model RBMK-1000 (a Chernobyl-type reactor), was permanently shut down at 00:24 Moscow time on December 19.

Construction permit application for Egyptian reactors submitted

July 6, 2021, 12:59PMNuclear News

Egypt’s Nuclear Power Plants Authority (NPPA) has applied to the Egyptian Nuclear and Radiological Regulation Authority (ENRRA) for a construction permit to begin building the first two of four proposed Russian-designed and -supplied reactors at Egypt’s El Dabaa site.

China’s Tianwan-6 up and running

June 11, 2021, 12:59PMNuclear News
The Tianwan-6 control room. Photo: CNNC

Unit 6 at the Tianwan nuclear plant has entered commercial operation, China National Nuclear Corporation announced last week. The domestically designed ACPR-1000 pressurized water reactor becomes CNNC’s 24th unit to enter service, raising the company’s installed generating capacity to 22.5 GWe (gross).

Russian unit begins commercial operation

March 24, 2021, 6:59AMNuclear News

Unit II-2 at Russia’s Leningrad plant has entered commercial operation. Photo: Rosenergoatom

Unit II-2 at the Leningrad nuclear power plant entered commercial operation on March 22, bringing the total number of operating power reactors in the Russian fleet to 38, state-owned nuclear power corporation Rosatom has announced.

The 1,066-MWe unit is one of two Russian-designed Generation III+ VVER-1200 pressurized water reactors now in service at the plant, the other, Unit II-1, having begun commercial operation in October 2018. There are also two VVER-1200 units up and running at Russia’s Novovoronezh facility, and two additional VVER-1200s are scheduled for Leningrad later this decade. Further, VVER-1200 projects are afoot at the Belarusian plant in Belarus (two units), El Dabaa in Egypt (four units), Hanhikivi in Finland (one unit), and Paks in Hungary (two units).

Leningrad II-2 replaces Leningrad I-2, a 925-MWe RBMK-1000 light water–cooled graphite-moderated reactor that permanently ceased operation in November 2020 after 45 years of service.

Russia retires reactor at Leningrad plant

November 13, 2020, 9:31AMNuclear News

The Leningrad nuclear power plant’s Unit I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor, was permanently shut down on November 10, according to Rosatom, Russia’s state atomic energy corporation. The shutdown occurred at 12:30 a.m. Moscow time.

The unit was the oldest operating reactor at the plant, having achieved initial criticality in May 1975 and entered commercial operation in February 1976. Two additional RBMK-1000s remain in operation at Leningrad—Units I-3 and I-4, both of which have been in operation for about 40 years.

The retired reactor is to be replaced by Unit II-2, one of two 1,085-MWe Generation III+ VVER-1200 pressurized water reactors at the Leningrad site. The new unit was connected to the Russian grid in October, and on November 6 it received regulatory approval to begin pilot operation. (Leningrad’s other VVER-1200, Unit II-1, started commercial operation in 2018.) Following the trial operation, Unit II-2 will be shut down for an additional equipment inspection by a state commission before being put into commercial operation early next year, according to Rosenergoatom, Rosatom’s electric power division.

Newly connected Belarusian reactor powers down

November 12, 2020, 12:00PMNuclear News

On November 8, less than a week after becoming Belarus’s first nuclear reactor to be connected to the power grid, and only one day after a visit to the Belarusian site from the country’s president, Alexander Lukashenko, to celebrate the accomplishment, Belarusian-1 was forced to cease power production, a report from the Associated Press states.

Belarus’s first nuclear reactor connects to grid

November 4, 2020, 6:57AMNuclear News

The Belarusian nuclear power plant. Photo: Rosatom

Belarus on November 3 became the latest nation to begin generating electricity with nuclear energy when Unit 1 of the Belarusian nuclear plant was connected to the country’s power grid.

The Belarusian construction project, located in the Grodno region of Belarus, features twin 1,109-MWe pressurized water reactors, supplied by Rosatom, Russia’s state-owned nuclear energy corporation. The units are VVER-1200 Generation III+ designs, model AES 2006. Just last week, a VVER-1200 was connected to the Russian grid at the Leningrad plant.

The start-up program for Unit 1 began on August 7, when the first fuel assembly with fresh nuclear fuel was loaded into the reactor, according to a Rosatom press release. The reactor achieved first criticality on October 11.

Once fully completed, the plant is expected to supply approximately 18 billion kWh of low-carbon electricity to the Belarus national grid every year, Rosatom said.

New unit delivers first electricity to Russian grid

October 30, 2020, 7:02AMNuclear News

Rosenergoatom, the electric power division of Russia’s state-owned nuclear power corporation Rosatom, announced on October 23 that Leningrad II-2 has been connected to the grid. The unit is one of two Generation III+ VVER-1200 pressurized water reactors at the Leningrad nuclear plant.

The reactor will replace Leningrad I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor that will permanently cease operation at the end of 2020 after 45 years of service. Fuel loading at Leningrad II-2 began in July, and initial criticality was achieved in August. Following the trial operation, the unit will be shut down for an additional equipment inspection by a state commission before being put into commercial operation early next year, according to Rosenergoatom.

Tianwan-5 ready for commercial operation

September 11, 2020, 9:29AMNuclear News

Unit 5 at the Tianwan nuclear plant. Photo: CNNC

Unit 5 at the Tianwan nuclear power plant completed its full-power continuous operation assessment on September 8, meeting the conditions for commercial operation, China National Nuclear Corporation reported. The domestically designed ACPR-1000 pressurized water reactor will become CNNC’s 22nd reactor to provide power to China’s electric grid, raising the CNNC fleet’s installed capacity from 19.112 million kilowatts to 20.230 million, according to the company.

Tianwan-5 construction officially commenced on December 27, 2015, with the pouring of safety-related concrete. China’s National Nuclear Safety Administration issued a 40-year operating license for the unit on July 7 of this year, and two days later CNNC announced that first fuel loading had been completed. The reactor achieved initial criticality on July 27 and connected to the grid on August 8. Once commercial operation of the unit has begun, Tianwan will boast five operating reactors.

Leningrad II unit reaches first criticality

September 2, 2020, 9:27AMNuclear News

Rosatom officials and plant staff celebrate in the control room at Leningrad II-2 as the unit achieves first criticality. Photo: Rosatom

Rosenergoatom, the electric power division of Rosatom, Russia’s state-owned nuclear power corporation, announced on August 31 that Leningrad II-2 has achieved initial criticality. The unit is one of two Generation III+ VVER-1200 pressurized water reactors at the Leningrad nuclear plant.

Leningrad II-2 is scheduled for commercial start early next year, replacing Leningrad I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor that will permanently cease operation at the end of 2020 after 45 years of service. Fuel loading at Leningrad II-2 began in July.

Fuel loading starts at Belarusian NPP

August 11, 2020, 3:07PMNuclear News

The Belarusian nuclear power plant. Photo: Rosatom

Fuel loading has commenced at Unit 1 of the Belarusian nuclear power plant, according to Rosatom, Russia’s state-owned nuclear energy corporation. The first fuel assembly was loaded into the unit at 11:45 a.m. (local time) on August 7, the company said, adding that a total of 163 assemblies will have been loaded by month’s end.

The plant, Belarus’s only nuclear power facility, houses two 1,109-MWe VVER-1200 pressurized water reactors. Unit 1 is scheduled to begin commercial operation later this year, with a Unit 2 startup slated for 2021.

Fuel loading begins at Leningrad II-2

July 21, 2020, 11:57AMNuclear News

Technicians at the Leningrad II-2 plant, where fuel loading recently took place. Photo: Rosenergoatom

The first of 163 nuclear fuel assemblies has been loaded into Leningrad II-2, marking the beginning of the Generation III+ unit’s physical startup, Rosenergoatom announced on July 19.

The electric power division of Rosatom, Russia’s state-owned atomic energy corporation, Rosenergoatom is the operator of all of Russia’s nuclear power plants. The fuel for Leningrad II-2, a 1,085-MWe VVER-1200 pressurized water reactor, was manufactured at the Novosibirsk Chemical Concentrates Plant, part of Rosatom subsidiary TVEL.